Service Interruptions
Here you will find a current list of ongoing and upcoming service interruptions across the campus.
Service Interruptions & Outages
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
3/13 |
Lennox Hall
Olin Hall
Palmer Hall |
On Friday, March 13, the CC Electric Shop will accompany Pikes Peak Regional Building and Morning Star Elevators as they perform the mandated five-year full load inspections on the lifts in Lennox Hall, Olin Hall, and Palmer Hall. Elevators in these buildings may be temporarily unavailable while testing is underway. Thank you for your patience as this required inspection is completed.
|
Ext 6983 |
|
|
|
|
Posted 3/5 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
3/16 |
Packard Hall |
JCI will be onsite to perform the required 5-year inspection of the sprinkler systems at Packard Hall. Inspectors will be accessing various parts of the building as needed. Please expect loud noises, technicians draining sprinkler lines, and possible odors from the sprinkler water during this work. Thank you for your understanding. |
Luke Scott X6678 |
|
|
|
|
Posted 3/13 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
3/16 |
Edith Gaylord House |
JCI will be onsite to perform the required 5-year inspection of the sprinkler systems at Edith Gaylord House. Inspectors will be accessing various parts of the building as needed. Please expect loud noises, technicians draining sprinkler lines, and possible odors from the sprinkler water during this work. Thank you for your understanding. |
Luke Scott X6678 |
|
|
|
|
Posted 3/13 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
3/16 |
Elbert House |
JCI will be onsite to perform the required 5-year inspection of the sprinkler systems at Elbert House. Inspectors will be accessing various parts of the building as needed. Please expect loud noises, technicians draining sprinkler lines, and possible odors from the sprinkler water during this work. Thank you for your understanding. |
Luke Scott X6678 |
|
|
|
|
Posted 3/13 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
3/16 |
Cornerstone |
Terminix will be onsite in Cornerstone conducting a pest evaluation. Access to various areas of the building may be needed throughout the day. Please be aware of personnel working in the area. Thank you for your cooperation.
|
Luke Scott X6678 |
|
|
|
|
Posted 3/13 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
3/16 |
Palmer Hall |
AmeriDri will be onsite to complete cleanup work in the 2nd floor History Department suites in Palmer Hall. As part of this work, crews will need to access ceiling areas. Please be aware of personnel working in the area and any temporary equipment that may be present. Thank you for your patience while this work is completed.
|
Luke Scott X6678 |
|
|
|
|
Posted 3/13 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
3/17 |
921 N Nevada |
JCI will be onsite to perform the required 5-year inspection of the sprinkler systems at 921 N Nevada. Inspectors will be accessing various parts of the building as needed. Please expect loud noises, technicians draining sprinkler lines, and possible odors from the sprinkler water during this work. Thank you for your understanding. |
Luke Scott X6678 |
|
|
|
|
Posted 3/13 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
3/16-3/18 |
Bemis Hall |
JCI will be onsite to perform the required 5-year inspection of the sprinkler systems at Bemis Hall. Inspectors will be accessing various parts of the building as needed. Please expect loud noises, technicians draining sprinkler lines, and possible odors from the sprinkler water during this work. Thank you for your understanding. |
Luke Scott X6678 |
|
|
|
|
Posted 3/13 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
3/18 |
El Pomar |
JCI will be onsite to perform the required 5-year inspection of the sprinkler systems at El Pomar. Inspectors will be accessing various parts of the building as needed. Please expect loud noises, technicians draining sprinkler lines, and possible odors from the sprinkler water during this work. Thank you for your understanding. |
Luke Scott X6678 |
|
|
|
|
Posted 3/13 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
3/18 |
South Hall |
First Onsite crews will be in South Hall making repairs to rooms on the 4th floor. Please be aware of personnel and equipment in the area while this work is underway. Thank you for your patience.
|
Luke Scott X6678 |
|
|
|
|
Posted 3/13 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
3/18 |
Jackson House |
First Onsite crews will be at Jackson House making repairs to the 2nd floor. Please be aware of personnel and equipment in the area while this work is underway. Thank you for your patience.
|
Luke Scott X6678 |
|
|
|
|
Posted 3/13 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
3/17-3/20 |
Spencer Center |
JCI will be onsite to perform the required 5-year inspection of the sprinkler systems at the Spencer Center. Inspectors will be accessing various parts of the building as needed. Please expect loud noises, technicians draining sprinkler lines, and possible odors from the sprinkler water during this work. Thank you for your understanding. |
Luke Scott X6678 |
|
|
|
|
Posted 3/13 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
3/18-3/20 |
FAC |
JCI will be onsite to perform the required 5-year inspection of the sprinkler systems at the FAC. Inspectors will be accessing various parts of the building as needed. Please expect loud noises, technicians draining sprinkler lines, and possible odors from the sprinkler water during this work. Thank you for your understanding. |
Luke Scott X6678 |
|
|
|
|
Posted 3/13 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
3/23 |
918 N Weber |
On Monday, March 23, contractors from Olson will be onsite at 918 N Weber to replace the building boiler between 9:00 a.m. and 5:00 p.m. During this time, building heat will be temporarily shut off while the replacement work is completed. Contractors will be working in the area and accessing the building through the basement back hatch, so please expect personnel moving in and out of that space throughout the day. Thank you for your patience while this work is completed.
|
Ext 7111 |
|
|
|
|
Posted 3/16 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
4/13 - 4/16 |
Fine Arts Center – Deco Lounge |
Please be advised that the Deco Lounge in the Fine Arts Center will have limited access April 13–16. CC Construction will be onsite replacing the floor behind the bar. Please avoid the work area during this time and be mindful of crews and equipment in the space. Thank you for your cooperation.
|
Ext 6572 |
|
|
|
|
Posted 3/3 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
Ongoing |
Worner |
Due to an underground pipe leak, access to the sidewalk along Cascade Avenue east of Worner will be limited. Please avoid the fenced work area and be mindful of crews and equipment in the vicinity. We appreciate your understanding while repairs are completed.
|
Ext 6678 |
|
|
|
|
Posted 3/2 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
Ongoing |
Packard Hall |
Please be advised that several spaces in Packard Hall were impacted by a flood this past Saturday, January 24. The following rooms are currently off limits except for authorized personnel: The basement area and room 203 are functional and accessible. Access can be coordinated as needed through EHS (Luke Scott). AmeriDri, ARS, and CRDN will be onsite over the coming week to perform remediation work. At this time, there is no estimated completion date. Thank you for your understanding.
|
Ext 6678 |
|
|
|
|
Updated 1/29 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
Ongoing |
El Diente |
EHS responded to a reported flood in Unit #103 and identified a severe sewage backup originating from the kitchen sink. The incident impacted the entire first floor of the unit. Immediate mitigation actions are underway and include:
Due to the nature of this Category 3 (black water) intrusion, all drywall on the first floor is being removed to a 4-foot level, along with affected basement ceiling materials. All first-floor contents, including cabinetry, furniture, carpet, and major appliances, are considered a total loss and will be disposed of. Access to the second floor is currently restricted to prevent cross-contamination. Unit #103 will remain offline indefinitely. There is no estimated timeline for return to service at this time. Further updates will be provided as remediation progresses. Thank you for your cooperation in limiting access to the space.
|
X6678
|
|
|
|
|
Updated 1/5 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
Ongoing |
Cornerstone |
The men’s restroom on the second floor of Cornerstone, located east of the theater, will be out of service while urinals are being replaced. Please plan accordingly. We appreciate your patience during this work.
|
X6915
|
|
|
|
|
Posted 1/2 |